项目 | 发表日期/作者 |
---|---|
WEB-223.dwg Schedule drawing for DN15 (½") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). |
10/27/2020 |
WEB-224.dwg Schedule drawing for DN20 (¾") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). |
10/27/2020 |
WEB-225.dwg Schedule drawing for DN25 (1") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). |
10/27/2020 |
WEB-226.dwg Schedule drawing for DN40 (1½") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). |
10/27/2020 |
WEB-227.dwg Schedule drawing for DN50 (2") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). |
10/27/2020 |
WEB-228.dwg Schedule drawing for DN65 (2½") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). |
10/27/2020 |
WEB-229.dwg Schedule drawing for DN80 (3") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). |
10/27/2020 |